Edit Content

Contact Information.

Whether you need immediate support, want to discuss your project needs, or simply have a query, our team is ready to assist you.

Phone

+65 88549106

Our Location

Bukom Engineering Services Pte. Ltd. (202516121N) 7500A Beach Road, #14-302, The Plaza, Singapore 199591

Bill of Material (BoM) Preparation & CMMS Integration in Singapore

Learn more about planning and scheduling your next project with our expert tips

What Is a Bill of Material (BoM)?

A BoM is the comprehensive list of raw materials, components, sub-assemblies, and quantities needed to build a new plant or asset. It forms the backbone of cost control, procurement planning, and production scheduling :contentReference[oaicite:0]{index=0}.

Why You Need Expert BoM Preparation

Seamless CMMS Integration

  • Why Integrate? Centralize maintenance schedules, work orders, and asset histories in one system for better uptime and efficiency :contentReference[oaicite:3]{index=3}.
  • Supported Platforms: We integrate into leading CMMS solutions—Limble, Cryotos, Maintenance Connection, and more—tailoring to your site’s needs :contentReference[oaicite:4]{index=4}.

Integration Steps:

  1. Data Mapping: Align BoM fields to CMMS item master structures (part code, description, UoM).
  2. Bulk Import: Use CSV/XML templates or API connectors to load BoM into your CMMS.
  3. Validation & Testing: Verify record accuracy, run test work orders, and adjust mappings.
  4. Training & Handover: Provide a step-by-step guide and on-site/remote training for your team.

Key Benefits for Your Singapore Facility

BES is driven by core values that reflect our dedication to quality, innovation, and integrity in everything we do.

Ready to Discuss Your Next Project?

Our engineers and project managers are here to support your plant performance and facility goals. Let’s build something that lasts.

Trusted by Industrial Leaders Across Singapore

Hear from clients who’ve relied on BES for critical engineering, turnaround, and maintenance services.

"BES handled our plant upgrade professionally and completed all work ahead of schedule. Truly reliable."

Daniel Tan Operations Manager

"From pipeline modifications to rotating equipment overhauls, their team is top-notch."

Serene Lim Facilities Lead

"We’ve worked with BES across multiple shutdowns. Their turnaround planning is efficient and thorough."

Jason Goh Plant Supervisor
Contact Form